![]() ![]() Like many city centre projects one lane of the highway must remain open throughout crane operations, meaning that full extension of the right-hand outriggers is not possible. To undertake the project, the crane is sitting outside on the street in front of the building, its outriggers are 100% fully extended on the left-hand side, and 60% short rigged on the right. The commercial property is undergoing major refurbishment and the staircase is one of the final elements of the job. It is a beautiful summer day in central London, and a Liebherr LTM 1130-5.1 all terrain crane, owned by Southern Cranes & Access has just placed a 2t section of a new staircase inside a five-storey office building. ![]() Mobile cranes can now calculate real time loading for a full complement of outrigger positions,maximising capacity and improving safety.